12.07.2012
15 July 2012
Resort project "Dolce Vita 7": photo after 3.5 months after the delivery of the object.
19 March 2012
Paving car parking with tiles.
The façade of the building was covered with ceramic tiles and aluminum railings which has been installed on balconies.
They installed aluminum rails on the entrance stairs and installed the main entrance door.
Plumbing in the bathrooms
Installing electrical outlets and switches.
13 March 2012
Kitchen cabinets, wardrobes and entrance doors have been installed.
We finished the infrastructure (electricity, water and telephone), tiled the floors on the roof terraces, prepared the walls for painting and began to install plumbing in the bathrooms.
7 March 2012
Installed windows in all apartments.
Even the entrance was glazed, although this project was not originally envisaged. The staircase should have been open, as in our other resort projects, for example, in the Sky Blue project or in the Dolce Vita project.
22 January 2012
Floors covered with granite.
Tiles installed on the floors and walls in all bathrooms.
13 January 2012
Plastering the walls has been done and finished
Another stone fence has been built around the site, marble windowsills has been installed.installing electrical wiring and water supply system, plastered the walls and ceramic granite flooring have been started.
19 November 2011
Brick works has been finished.
5 November 2011
Finishing filling the frames.
And the brickwork has began.
25 October 2011
During the first week of sales, we sold 4 of 6 apartments in the "Dolce Vita 7" resort in Kyrenia (North Cyprus).
Concrete columns and floors of 1 floor has been done.
Concrete columns of the second floor has been done.
20 October 2011
We began to build a resort project "Dolce Vita7" in Kyrenia, North Cyprus.
Excellent investment!